Chinook Trail Middle School

JP Arnold

Chinook Trail Middle School was a custom design-build with a state-of-the-art environment that allows for sustainability and energy-efficiency. This 21st century school encompasses learning pods, a coffee shop-style library, a curiosity center, learning stair and a cafeteria-to-theater room with stadium seating. The educational theme of the school was to provide project-based learning environments for students. The collaborative design planning group …

Legacy Peak Elementary & Challenger Learning Center

JP Arnold

Legacy Peak Elementary & Challenger Learning Center was a multi-building design/build project consisting of a K-5 elementary school (60,000 SF), a Center for Modern Learning (22,600 SF) and Challenger Learning Center (10,500 SF). In Northern Colorado Springs, Legacy Peak is part of the expanding Academy School District 20 as it supports 600 preschool through fifth grade students with a learning …

Central New Mexico Community College, Smith Brasher Hall Renovation & Addition

Kim Altmire

In 2017, Smith Brasher Hall underwent a major renovation and expansion to consolidate CNMCC’s School of Business and Information Technology programs in one location. The new 85,438 square-foot building is designed for 21st century learning, with high-tech classrooms, interactive network/computer labs, and areas for students and faculty to gather and collaborate. Smith Brasher is anticipated to earn LEED Gold certification. …

Phoenix Theater

bpce

Having undergone several renovations and name changes since its inception in 1920, the Phoenix Theater reached new heights in 2013 when the theater not only underwent a renovation, but also opened the doors to a state-of-the-art, 250-seat Black Box Theater. The redesigned main stage consists of a fully realized modern stage house, wing space, fly loft, under-stage traps and auditorium …

Kirtland Air Force Base, Aircraft Maintenance Facility

Kasey Skarsgard

Bridgers & Paxton designed the mechanical, electrical, plumbing and technology systems for the new construction, HMC-130 Fuel Cell Maintenance Hangar, Armament Shop and Corrosion Control Facility at Kirtland Airforce Base. The 32,208 SF H/MC-130 Fuel Cell Facility is a one-story facility with a hangar bay sized for the H/MC-130 aircraft, offices, locker room, breakroom, and a dispatch office. The Hangar …

Yuma Regional Medical Center Emergency Department

bpce

Constructed in 1957, Yuma Regional Medical Center is home to a growing community that had outgrown its medical resource, leaving a need for an expansion of the Emergency Department. In three-years, the design team was able to expand the facility to 71,000+ SF, add a three-level parking garage to alleviate pedestrian traffic and parking issues, and relocate the central utility …

City of Albuquerque, Patrick J. Baca Library

Kasey Skarsgard

Completed in 2015 and the largest branch library in the system, the Patrick J. Baca Library is unique in its own right. The two-story library features state-of-the-art mechanical, electrical, A/V, security and IT systems, all designed by B&P. The library uses an underfloor air distribution/raised floor system which will ease the work of redistributing systems for future expansion. Focusing on …